For this week David and I were finally able to finalize the move of the track! Below I attached some images that we were able to capture during the move.





I also focused my attention on getting a new third rail design. After some discussion with the bogie team, we decided to make a new third rail design that would resemble a pipe in order to lower the cost and make manufacturing more likely. Below is the new design I was able to come up with. The pipe had a diameter of 2.25". Meanwhile, David focused his attention on talking to manufacturers in order to get some quotes as well as find the feasibility of manufacturing.